Project-Utility Box Wraps; 2018-2021 | |||||||||||||||||||||
Pictured below is the sixth installation completed in 2020. East Lk Samm/Inglewood Hill Road | |||||||||||||||||||||
A series
of articles is being written on each individual installation. (text submitted for installation to follow) |
|||||||||||||||||||||
|
|||||||||||||||||||||
|
|||||||||||||||||||||
Installation and reinstallation;11/09/20 | Service Unit and Tesco Cabinet | Service Unit and Tesco Cabinet | |||||||||||||||||||
Correct
identification coming. Pictured above: Left exposure, top to bottom, P cabinet |
Pictured
above: Left side exposure, top to bottom, P cabinet Right exposure, top to bottom; Skyline cabinet: |
Pictured
above: Cabinet top: Monohon Mill #2; 1933-1939 Left exposure, top to bottom: Right exposure, top to bottom: |
|||||||||||||||||||
Pictured
above: Photo on top of P cabinet is of Alexander's Monohon Donkey Crew; circa 1924-1927 Left exposure, top to bottom, P cabinet Smaller Skyline cabinet in rear contains: |
Pictured
above: P cabinet Left exposure, top to bottom Front exposure, top to bottom |
Pictured
above: Cabinet top: Monohon Mill #2; 1933-1939 Left exposure, top to bottom: Right exposure, top to bottom: |
|||||||||||||||||||
Second Redo Layout Proofs; East Lake Sammamish Parkway NE and Inglewood Hill Road NE | |||||||||||||||||||||
Below proof comment sent to Sara, but in the redo, she only prepared a 2.5" x 1.5" patch which is unacceptable. I had suggested that she might consider a panel which could be applied to entire lid width of this P cabinet, but she opted to prepare a patch which will not do. Therefore, I have requested the entire panel be redone with the correct 1930 logo (2020 dated version) for future reinstallation. | |||||||||||||||||||||
Layout Proofs; East Lake Sammamish Parkway NE and Inglewood Hill Road NE | |||||||||||||||||||||
Final Layout Proof; 228th and 4th Street S; Service Cabinet | |||||||||||||||||||||
Tri-Graphic; 228th and 24th Street SE (Pine Lake/Discovery) This includes 1890 kids' reports cards, teacher's contract, etc.. | |||||||||||||||||||||
proof | |||||||||||||||||||||
Below is the entry included in the 2018 Winter REC Guide of a Sammamish City Newsletter | |||||||||||||||||||||
NOTE: This project could not have been executed without the genuine and sincere efforts of the following employees at TrafficWrapZ: (1) Herb Kiekenapp, Global Director and local coordinator of all details, (2) Dan Gittere, VP of TrafficWrapZ, (3, 4, 5, 6) Aaron Reinbold, Pablo Marin, Latashia Benjamin, and Sara Segall, genius layout designers and publication experts, and (7, 8) Nick Nagel and Li Vara Plazas, indescribable exceptional installation artists. This is a professional privilege to experience how this organization listens, executes, and assures satisfaction of a quality product. | |||||||||||||||||||||
Music: "Let There Be Peace" | |||||||||||||||||||||
Home
| Locations
| No.1 Box | No.2
Box | No.3 Box | No.4
Box | No.5 Box | No.6
Box | No.7 Box | No.8 Box | No.9 Box | No.10 Box | No.11 Box | Harry Military | Sammi Award | Golf | Claradell Hall of Fame | Volunteer | Skates | Contact | Projects | City Council ©2023-csheddgraphics All rights reserved. All images and content are © copyright of their respective copyright owners. |